top of page

HMR Projects

Search

Banks Peninsula Storm Damage Clean Up

  • Apr 28
  • 1 min read

Updated: Apr 30


Project Overview

Storm damage clean-up completed across a rural property in Banks Peninsula. The work included fallen tree removal, slip clearing, access restoration, river reinstatement, and general site tidy-up.


Location: Banks Peninsula, Canterbury

Client Type: Tier 1 roading contractor

Job Type: Earthworks, vegetation clearing, river remediation



Client Challenge

Storm damage caused fallen trees, blocked access, unstable ground, and affected river areas across the property. The site needed to be made safe, accessible, and functional again.


What We Delivered

  • Removal of fallen trees

  • Clearing of slips and unstable ground

  • Reinstating access tracks and roadways

  • River reinstatement

  • Full site tidy-up


Outcome

The property was restored to a safe and functional state, with access reinstated, hazards removed, and damaged areas cleared so normal use of the land could continue.



HMR Contracting. Chipping Good!

Wood Chipping & Vegetation Control

0275 767 227 | 0800 344 467

 
 

Need a quote or site visit?

 

Call us anytime.

bottom of page