Mid Canterbury Farm Track Maintenance & Drainage
- Apr 28
- 1 min read
Project Overview
Farm track maintenance and drainage improvements completed in Mid Canterbury. The project focused on restoring access, improving track stability, and reducing future damage caused by poor drainage.
Location: Mid Canterbury
Client Type: Farming
Job Type: Track maintenance, drainage, earthworks

Client Challenge
Damaged tracks and poor drainage were affecting farm access and causing ongoing wear, making the area harder to use and maintain.
What We Delivered
Excavation of problem areas
Installation of drainage soak holes
Placement of rock for stability
Track reshaping and repair
General access improvements
Outcome
The tracks were stabilised with improved drainage, helping reduce future maintenance and providing more reliable access across the property.
HMR Contracting. Chipping Good!
Wood Chipping & Vegetation Control
0275 767 227 | 0800 344 467













